重油发电机组安装施工组织设计
- 文档部分内容预览:
-
建筑方案Civil Construction Scheme
1. 工程测量 Project Survey
1.1. 一级施工控制网的布置及施测 Lay out & Survey for the First-class Construction Control Net
根据业主提供测量成果资料,委托有专业资质的测绘单位,在测区内布设E级GPS控制网作为厂区的一级施工控制网。
Based on the survey information provided by client, invite a professional company to do the work of survey. Setting Class-E GPS control net within the survey area, which is the first class control net for construction.
1.1. 施工二级控制网布置及施测Lay out & Survey for the Second-class Construction Con....
-