某市金桥路等4条道路工程施工第四标段湖西路技术标.doc

  • 某市金桥路等4条道路工程施工第四标段湖西路技术标.doc为doc格式
  • 文件大小:22.6 M
  • 下载速度:极速
  • 文件评级
  • 更新时间:2020-12-26
  • 发 布 人: 薛晓禅
  • 原始文件下载:
  • 立即下载

  • 文档部分内容预览:
  • 目  录

    第一章  总则··············································3-4

    一、编制说明············································3-4

    二、编制依据············································3-4

    第二章  工程概况··········································3-6

    一、工程简介············································3-6

    二、道路工程············································3-6

    三、排水工程············································3-9

    四、施工注意事项·········································3-10

    五、工期···············································3-11

    六、质量目标···········································3-11

    七、安全目标···········································3-12

    八、工程特点···········································3-12

    第三章  施工方案与技术措施·······························3-13

    一、施工方案···········································3-13

    (一)施工原则·······································3-13

    (二)施工计划及施工方案安排·························3-13

    二、施工技术措施·······································3-13

    (一)污水工程·······································3-13

    (二)雨水工程·······································3-19

    (三)道路工程·······································3-24

    第四章  质量管理体系与措施·······························3-44

    一、质量保证措施·······································3-44

    二、施工准备阶段质量控制································3-45

    三、施工阶段的质量控制··································3-46

    四、竣工验收阶段质量控制·······························3-47

    五、工程质量控制的实验方法·······························3-47

    六、竣工资料的整理及评定·······························3-47

    第五章  安全管理体系与措施·······························3-49

    一、建立安全生产保证体系·······························3-49

    二、安全生产目标·······································3-49

    三、交通疏导安全措施···································3-49

    四、确保安全生产的技术组织措施·························3-50

    五、应急组织及处理突发事件的措施·······················3-52

    第六章  文明及环保管理体系与措施·························3-55

    一、文明施工管理体系与措施·······························3-55

    二、环境保护管理体系与措施·····························3-57

    第七章  工程进度计划与措施·······························3-60

    一、施工原则···········································3-60

    二、工程施工计划·······································3-60

    三、施工进度计划图·····································3-60

    四、确保工期的技术组织措施·····························3-61

    五、施工准备工作·······································3-63

    第八章 施工期间的保通措施································3-66

    第九章  配合措施·········································3-67

    第十章  资源配备计划·····································3-69

    一、劳动力配备计划·····································3-69

    二、主要施工机械及仪器配备计划··························3-70三、材料配备计划·······································3-71

    第十一章 项目管理班子的配备·······························3-72

    一、项目管理机构组成···································3-72

    二、明确项目部各职人员职责·······························3-73

    第十二章   施工总平面图··································3-78

    第十三章  质量通病的防治措施······························3-80

    第十四章  冬、雨季施工措施·································3-92

    一、冬季施工措施·······································3-92

    二、雨季施工措·施········································3-93

    第十五章  按报价完成工程建设的技术和管理措施·············3-97

    一、确保按报价完成工程建设的技术措施···················3-97

    二、确保按报价完成工程建设的管理措施···················3-97

    附表一  拟投入的主要施工设备表···························3-99

    附表二  拟配备的试验和检测仪器设备表·····················3-101

    附表三  劳动力计划表····································3-102

    附表四  施工进度表······································3-103

    附表五  施工总平面图····································3-104

    附表六  临时用地表······································3-105

     

     

     

    ....